Showing posts with label engine shed. Show all posts
Showing posts with label engine shed. Show all posts

Wednesday 1st May 2024

Worklist:
Fit new rainwater pipe.
Complete foliage around pipework (track leading to the fiddleyard).
Fit magnets to engine shed.
Add foliage to the long fence.
Add weeds to base of all buildings.
Assess the pallets and crates printed to date.

The third downpipe needed a double swan-neck, which Stephen fabricated from 4mm plastic tube. It took a fair bit of trial and error to get the joints correct, then a lot of filing to achieve the final shape. This was spliced onto 3+ lengths of 3D printed downpipe, and suitably weathered.


Main building cladding, windows and rainwater goods are all 3D printed.

Geoff continued to build-up the foliage on the pipework frame looping over the track going into the fiddleyard.


The engine shed is located over 4 vertical cocktail sticks, but is not fixed down, meaning it could fall off in transit. Rather than bolts, Stephen chose magnets - round magnets in a bucket (below) and rectangular magnets in a plasticard toolbox. Both were glued to the brick plinth with epoxy glue, 'diagonally opposed'. Countersunk holes were made in the plaster floor and 4mm screws inserted through to the plywood below. Both ends of the building were now perfectly held in place, but it can be removed for access to the lighting and the interior generally.


Geoff moved on to applying foliage to the long, bare Peco fence running up to the bridge. A variety of materials were used, starting with PVA, then a light spray of isopropyl alcohol diluted with water, which allowed to glue to spread more easily.



Both then moved on to applying small amounts of foliage along the bottom of the factory buildings and the cottages. Mostly subtle hints of weeds with occasional long grass clumps made from cut-down self-adhesive 'dots' of grass and a few electrostatic grass clumps.




Finally, an array of old 3D printed pallets was amassed, with many stacked and glued together to see how it might look. These were printed from drawings created 'in-house', but Geoff had also been experimenting with newly downloaded files, with varying success. Some of these included timbers which were far too thick to be used, often due to poor draughtsmanship. A selection of solid cases were also discovered which should make for an interesting yard. Geoff jokingly suggested that the front building could become a pallet/crate manufacturer. That's not a bad idea!


Stephen had made up one of the new flat wagons, but didn't have suitable wood for the decking and ends. Geoff had printed a few more wagons 'for homework' and supplied some of the basswood sheeting used on the prototype and the original stone wagons.



That water tower still needs a feed pipe!


The end of the layout
(so far....)




Wednesday 27th March 2024

Worklist:
Make and fit diagonal bracing for the new board legs.
Make and fit end panels for transporting new boards in one unit.
Fix faulty point outside engine shed.
Wire-up power supply for engine shed lights.


Having made the two leg frames for the new boards, it was decided that adding diagonal bracing would turn them into a rigid frame that was safer and more useful. Two lengths of timber were cut to length and bolts holes drilled at the ends. Self-tapping M6 sockets were fitted in pre-drilled holes in the uprights and the cross-braces fitted. However, these braces were fitted with one on each side, which did not provide the rigidity assumed. The last job of the day was to modify one of the braces so that they could be fitted beside each other, with a bolt in the centre, to make it rigid.


A fault had been noted in the operation of the point from the engine shed into the ash siding. The boards were clamped vertically on the frame for easy access to the underside.


After much investigation, Geoff determined the travel of the servo horn was excessive, causing 'bounce-back'. The only solution was to reprogram the point motor on the master servo control module. Instructions had to be re-read and the handheld programmer tracked down, but the issue was resolved, eventually. (Good practice for the exhibition!).


After unbolting and placing the two new boards on the floor, a compact and comfortable overlapping arrangement was established. 


The ends, bolt hole and pin positions were measured, before two pieces of MDF were cut to size and holes drilled. The ends were then bolted in place and a very neat transportable module was revealed.


Meanwhile, Stephen was able to wire-up the shed lights to the power supply unit installed many months previously, which provided a much better view of the interior.


The lamp shades were cut from a strip of pill holding plastic.