Worklist:
Review Geoff's work on the new ground surfaces and paint them.
Adapt the workshop storage frame to the new board depth.
Geoff had completed the paper mache covering to the new scenic areas. It was now hard, allowing us to trim and sand the edges. He then painted the areas with brown powder paint mixed with diluted PVA. Grass and foliage will be added next week.
Meanwhile, Stephen worked on the extension to the wall at the end of the station. The new base panel was sanded to the correct thickness and a piece of 'English garden wall bond' plasticard cut to size. Contact adhesive was used to glue them together. A brick coping and oversailing brick course will be attempted next week.
We then moved on to the storage rack in the workshop. The extended boards now stuck out proud of the frame and prevented the cover screen keeping the dust out. The frame was moved off the wall and timber panels added to enclose the sides and shelves.