Worklist:
Continue with electrics - test all track sections and servos.
Update diagram on control panel.
Track sections were generally ok, and it became a useful exercise to a reinforce our knowledge of the wiring system and track breaks. This was especially true of the area around the signals and the switching for the 'no-mans-land' between the station and Edwards yard. However, the servo test failed 'unusually'. Investigation found that power to the two station-board servos had been taken off the station platform lighting rather than a common supply. Having to turn these lights on before operating the magnets would have been a talking point, but ultimately a 'right nuisance'. This was easily corrected.
Testing of the uncouplers and sections by 'playing trains' took place, which went well and gave us a good idea of future running operations. Markers for the three magnets will be a priority.
Stephen still had some of the vinyl from previous panel work and made the required additions. At the same time, alterations were made to the existing mainline section to more accurately reflect the section positions. Hopefully, it will all make sense to all operators.
A rewarding days work. What became evident was that Geoff's original assertion that the station needed a siding that could take a whole train of quarry wagons without clogging-up the station area, works well. It does change the overall appearance of the station, hopefully, for the better.