Geoff had made a start on the work as a diversion from his "big project", but things weren't going to plan and investigations were required. We had a few initial problems with the section switches and a few un-gapped PCB sleepers on the new points didn't help. Strangely, we found an existing track section that had been modified in connection with the fitting of the signals, which required re-wiring. After correcting the anomalies and completing the wiring, it all slowly fell into place and we were able to successfully test everything.