Wednesday 7th February 2024

Worklist:
Final fixing details for the legs.
Fit main backscene panel to layout.

We had decided that the new legs would be 'located' on the front with wooden blocks and only fixed in place with a single bolt on the back. (A fixing on the front only had to prevent a leg being knocked sideways and an M8 bolt head on the front wouldn't look very pretty). Fixing the blocks required lots of gluing, clamping, drilling and screwing for the boards and legs.





The final task was to drill the holes for the new backscene panel. 'Holes' included panel fixings and holes for the control panel to be fixed through the panel.


The new end panel will be tackled next week.