Worklist:
Review the printed masons building windows and assembled high level walkway unit.
Glue the two sections of cottages together.
Continue making the loading/unloading building.
Paint the edge of the quarry and continue painting the water.
Paint the engine shed floor.

Two different sized elevations had been created using just two window designs. This will simplify the 3D printing of the windows. It was agreed that a door would be incorporated into the middle of the left hand building. (See later).


Stephen had been working on the cottages at home, but brought the two sections down to ensure that they accurately aligned with the scenery before they were glued together. 


Geoff mixed up some earth-mix and coated the banks of the quarry.


Stephen moved on to constructing the shell of the loading-bay building. This will be independent from the adjacent buildings and include parapets, a flat roof and possibly other features like a tank room. 



The engine shed floor was given a coat of concrete coloured paint and then heavily dirtied.


The whole backdrop of buildings are looking quite effective.




View from the fiddleyard.


Post Christmas doodle!