Simultaneous projects this week. Stephen worked on the small Edwards building, adding a 1st floor ceiling, to allow LED lighting to be fitted. Geoff worked on the baseboard, to ensure there was a power supply for the lights.
![]() |
| The current interior walls and first floor are removeable for just this occasion. |
![]() |
| L - Upper floor and R - ground floor. |
However, the new first floor ceiling board was below the window heads, so instead, we will fix a ceiling into the roof for the lights, which will require plugs for dismantling.
Meanwhile, Geoff checked the baseboard for suitable power supplies. Looking for the 'General Use' 19v supply required some investigation, but eventually one was found. In the process, he labelled up all of the electrics and declared that it was 'as he had always imagined the boards should be labelled'. Obviously a future (next?) project.



