The final stage of the new points operating method was to transfer the existing switch wires to the new, single switch. Following testing before work started some weeks ago, Geoff had produced a suitable diagram, which made the process easier. The exercise was not without a few glitches (just two wires had to be transposed), but eventually, the points worked using the test meter. The boards were then laid down, the power and a controller plugged into the control panel, and a loco introduced.