Happy New Year to all of our readers!
The first job of 2025 was to mark the ground level on the front extension board and cut down the inner plywood upstand to a few millimetres lower than ground level to allow for the ground materials.
Three 8mm holes were drilled along the edge for the usual M8 bolts that will hold the extension to the main board. This was then set aside and the components for the next board extension assembled.
Next frame:
Holes were drilled and countersunk in the inner strip for the block fixing screws. The blocks were glued and screwed in place and the part frame was clamped in place.
We had discussed the option of tapering the board end and also whether to finish before the bridge structure, but finally decided on the maximum size possible. Adjustments can always be made at a later date.