Wednesday 10th February

Worklist:
Main gateway details
Goods shed lighting
Fencing

Geoff made more progress on the main gateway.



Stephen worked on the goods shed led light-strip he'd repaired. As there were a few spare led's left on the 'donor' strip, two more were added, making a 4-led strip, which lit up the shed beautifully. The power unit was fitted under the baseboard and the light strip temporarily secured in the shed.

A switch frame was made from wood strips, and bolted in place under the glass-fibre hillside. There are currently four items requiring power on this board, but space for six switches was allowed for.

Before Stephen took over the board completely, Laurence finished 'touching-up' the ground around the new fence. It was agreed that the gap between the end of the fence and the edge of the timber cross-over would be filled with a post and notice board about being alert to moving trains.




What to put on the top of the gate piers is a common discussion at present. Balls seem most common, but birds, dogs, urns, pineapples, mythical beasts etc., all find their way onto them. A few examples, in no particular order!