Wednesday 7th July 2021

Worklist:
Review Geoff's investigations into replicating the LED's on the point work servo's remote setup controller.
Fit guides to the new board storage frame.

A full house, with Laurence fully recovered.

Geoff had successfully worked out how to replicate the LED's on the point work setup unit. This entailed a couple of additional wires soldered to the control board and two short RJ45 extension leads. When these had been adapted, fitted with plugs for the control board and wired up, an RJ45 socket was available to plug into the remote adjustment module.


After fitting the remote cable socket in place we checked what was on the other side and decided that it probably clashed with an inspection pit inside the engine shed (of yet indeterminate size and shape), so the three units were moved accordingly. This concluded the wiring on all of the new boards.

In the meantime, Stephen had started to make up strips of 9mm ply to act as guides on the storage rack to allow boards to be slid into place without bashing the angle frame and board ends.