Wednesday 1st November

Worklist:
Generator room details
Fiddleyard cassettes

Geoff progressed the generator room interior, assembling the gantry and battery racks. It looks like the corner reinforcing triangles will have to be removed.


All three were involved in deciding what size cassettes were required and how best to use the 1200 x 600 sheet of 12mm MDF that had been purchased. Once decided (a mix of standard '770/800mm' and some shorter units) the MDF was cut down on the bandsaw using a a length of heavy steel angle as a replacement guide. Red plastic strips for the re-railers and some 1.5mm packing strips were also cut.



Laurence continued to work on the cassette he had started to make, while Stephen got comfortable and cleaned-up all of the newly cut materials.


Unfortunately, Geoff couldn't make ExpoNG, so the South Eastern Finecast stone walling sheets S&L had purchased at the show were reviewed and approved for use as cladding for the final/main building on the layout.